National Repository of Grey Literature 3 records found  Search took 0.00 seconds. 
Optimization of the Wire Drawing Process
Kabilka, David ; Světlík, Radim (referee) ; Řiháček, Jan (advisor)
The aim of work is to present and analyse assessment of the current state and at the same time the proposal of adjustments to the technology or parameters, the introduction of the wire into the drawing machine. The problem arises when the introduction of wire with a diameter of 14 mm from the material CK 67 to the drawbenches Schumag. If we introduce the wire into the drawing machines with two primary beams leads to a buckling of the wire and pack between the drawing die and the boot device. For the introduction of wire are used hydraulic boot collets, which are controlled semi-automatically. In connection with professional studies and on the basis of the calculation, simulation and practical experiment have been identified the conditions allowing the current method of deployment of wire to use.
Topology optimization of the towing equipment
Skoupil, Vladimír ; Pokorný, Přemysl (referee) ; Zeizinger, Lukáš (advisor)
This bachelor's thesis deals with the use of topology optimization to design as efficient machine components as possible. The theoretical part of the work deals with the principle and methods of performing topology optimization. In this part, research is also carried out on the issue of towing devices and the requirements placed on them. In the practical part, the topology optimization of the towing hitch for a passenger car is carried out and subsequently there is comparison of the designed towing hitch with the conventional shape.
Optimization of the Wire Drawing Process
Kabilka, David ; Světlík, Radim (referee) ; Řiháček, Jan (advisor)
The aim of work is to present and analyse assessment of the current state and at the same time the proposal of adjustments to the technology or parameters, the introduction of the wire into the drawing machine. The problem arises when the introduction of wire with a diameter of 14 mm from the material CK 67 to the drawbenches Schumag. If we introduce the wire into the drawing machines with two primary beams leads to a buckling of the wire and pack between the drawing die and the boot device. For the introduction of wire are used hydraulic boot collets, which are controlled semi-automatically. In connection with professional studies and on the basis of the calculation, simulation and practical experiment have been identified the conditions allowing the current method of deployment of wire to use.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.